villaplungepools

Entertaining The Kids During Quarantine - Easy Pool Installation

Our client's kids had grown out of their climbing equipment and their parents wanted a quick and easy pool installation within their small space in their front courtyard, to maximize their outdoor entertaining space. They still wanted the premium look of a tiled concrete pool without having trades working in their garden for three months. Our pools are built off-site, including all the tiling, etc done off-site, and lifted in.


We promised a pool delivered within 3 months, with a minimum time of three days on-site to install the pool. We delivered!!


Before:


In Construction:


After:





Comment (1)