Houzz Logo Print
webuser_814609774

Changing bath from a centre waste to end waste

J D
3 years ago

I am renovating my bath (it is a shower over bath so this limits my bathtub options) and currently there is a centre waste. The only shower over baths that I can find which would be suitable for my small bathroom have wastes at the end. I think my bathroom is on a concrete slab.


Does anyone have an idea of how expensive it would be for the plumber to change the waste to an end waste? Would it be as simple as using a flexi pipe or 90 degree bend, or would it likely involve drilling into the concrete slab? The waste position would only need to be moved about 60-70cm from my calculations.


Thanks!

Comments (2)