Normanhurst Residence
Adding on to an existing first floor addition, we built an oversized master bedroom with walk-through wardrobe, into the master ensuite. The entire house received new colorbond roof cladding to replace the existing tiles, while the first floor had its old, dated cladding replaced with vertical hardies sheeting.
On the ground floor we renovated the existing small office to create one large study/spare room by removing the two internal walls. As you can tell, our clients really like the colour green!
On the ground floor we renovated the existing small office to create one large study/spare room by removing the two internal walls. As you can tell, our clients really like the colour green!
Project Year: 2024
Country: Australia
Postcode: 2076