New Build - Upper Coomera
This project was a complete labour of love, as it is our home. From the concept design to final working drawings, right through the build process, which I project managed, to the selections, fixtures and fittings, specifications, interior design, interior decorating and landscaping. The project took 18 months from the time we found the block of land, to the design phase and 8 months to build.
Project Year: 2015
Project Cost: $200,001 AUD - $500,000 AUD
Country: Australia
Postcode: 4209