Houzz Logo Print
lynettemnisbet

Covering permanent formwork

Our home is two storey. This is the roof in the downstairs area of our home - formwork upon which the concrete slab is poured - how can I change this to look like a internal ceiling such as plasterboard or other options and do I need to worry about drilling into this Permanent Structural Formwork. Obviously on top of this formwork is a slab of concrete.

Comments (10)