Houzz Logo Print
Design ideas for a mid-sized modern kids bathroom in Melbourne with furniture-like cabinets, light wood cabinets, a one-piece toilet, gray tile, porcelain tile, grey walls, porcelain floors, engineered quartz benchtops, grey floor, white benchtops, a single vanity and a floating vanity.

Aspendale Ensuite

Modern Bathroom, Melbourne

Bathroom located in a townhouse in Aspendale, steps away from the beach. Client contacted us due to the shower leaking through to the ceiling in the room below the bathroom. The client wanted us to provide him with a quote to renovate the entire bathroom, and a second option to renovate the shower on it’s own without disturbing the remainder of the bathroom. We presented our proposals to the client, and he opted for the full bathroom renovation option. The client sent us some images from google of bathrooms that were the “vibe” he was wanting to achieve. He had requested a hotel style bathroom. We produced a mood board of fittings, fixtures and tiles, and the client was happy that we had made his vision come to life. We used matt black shower screen and fittings, the timber look vanity against the natural moody grey tiles, the client informed us that we had nailed his brief and he was beyond impressed with the quality of the workmanship, and the end to end customer experience we had provided him with. Timeline of this job; 28/4/2021 at 11/39am: Client made initial phone contact with the office requesting a quote and site visit. 28/4/2021 11.39am Client made initial phone contact with the office requesting a quote and site visit 28/4/2021 11.48am Site visit was confirmed and booked in for our team to attend on 6/5/2021 6/5/2021 4.01pm Site was visited by our team, measurements taken, client brief discussed, bathroom inspected. 7/5/2021 12.12pm Quote options, proposal and moodboard containing images of fittings, fixtures and tiles as per the brief sent to client via email 8/5/2021 4.54pm Client accepted quote for full bathroom renovation 12/5/2021 7.30am Works commence, bathroom is stripped out using our high quality dust extraction system and connected tools. Plumbing rough in is completed. 13/5/2021 3.42pm Bathroom is rebuilt and sheeted. 14/5/2021 10.30am Bathroom receives first coat of waterproofing 17/5/2021 9.00am Bathroom receives final coat of waterproofing 18/5/2021 1.49pm Shower base is screeded and floor outside shower is tiled 19/5/2021 3.11pm Shower base and RHS wall of bathroom and wall behind toilet are tiled. 20/5/2021 2.04pm All tiling is complete 21/5/2021 10.30am Grouting is complete 24/5/2021 10.30am Cauling is completed 25/5/2021 12.40pm Plumbing is fitted off (installed) toilet, vanity, tapware 26/5/2021 11.05am Shower screen is installed and bathroom is handed over to client, ready to use in 24 hours.